To be fair, it took me a day to remove everything and put the tray in / alter shower pipework
Then went back for a day and fitted shower, door and basin/ toilet
Tiler took about 5 days at least.
Then went back for a day and fitted shower, door and basin/ toilet
Tiler took about 5 days at least.