K
Koogatubac
Been absolutely pee'd off since 9:30 this morning, customer wanted a shower tray secured on floorboards, told them 5 times inc new employer that i should cut boards around tray and fit new marine ply at least 18mm thick under tray and strut and support corners on joists alot better before tray gets glued down
Customer didnt want this and wanted it straight on boards, after a arguement i did it, after 20hours of fitting, it now bounces (floor fault), told him that its the floors fault and should of gone with my advice, he now said HE DIDNT mention that he thought best on floorboards and wants it done right (my way)
Carefully take up tray (took me a hour since it was stuck down really well) got in another massive argument, slagging me off saying im rough for putting it down when i knew i was doing it wrong.
Like wtf?!!!
Went to 2 services then finished a boiler job inc 4 rads with decorators trying to crack banter with me. Ive been in a absolute stinking mood, felt like wrapping it up and giving up on plumbing! Now hit the booze and plan on getting smashed and fat lol sick as!!
Customer didnt want this and wanted it straight on boards, after a arguement i did it, after 20hours of fitting, it now bounces (floor fault), told him that its the floors fault and should of gone with my advice, he now said HE DIDNT mention that he thought best on floorboards and wants it done right (my way)
Carefully take up tray (took me a hour since it was stuck down really well) got in another massive argument, slagging me off saying im rough for putting it down when i knew i was doing it wrong.
Like wtf?!!!
Went to 2 services then finished a boiler job inc 4 rads with decorators trying to crack banter with me. Ive been in a absolute stinking mood, felt like wrapping it up and giving up on plumbing! Now hit the booze and plan on getting smashed and fat lol sick as!!