Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
  • Screenshot_20191031-033046.png
I am looking at moving out of this now feel the time is right , just a case of waiting for the right job.
Wish you well mate if its that bad them it time for a change of career, don't wait around go out there get what you want no one gives you anything in this world you have to make your own way any idea which way you want to go my nephew just got a job working for General electric completely different career from what he trained in hes a great kid with a real go getter
Full bathroom to take out for me this week coming. Then back there in 2 weeks time to fit everything other then the shower tray after the sparks and tiler have been.
Come on H don't be shy show us what you got .
[automerge]1572633689[/automerge]
Rescued the leaking shower replaced everything bar Mira Excel ordered new chrome controls for a face lift, new riser rail fitted just the vanity unit to go back when it's had a new top made . Cheers all kop
 

Attachments

Last edited:
Went to replace a shower cartridge today and guy just mentioned the down stairs rads were cool and the upstairs hot .
Looked in cylinder cupboard and sees a open vented Y plan. with a 20 odd year old gruni.
I told guy its probably the pump , I went downstairs a while after and sees a Ariston system boiler with a pressure gauge saying1.5 bar . Me thinks something's amiss here.
 
Yep Mcalpine Shaunie to tight under there for my big mitts 😛 , merlyn stuff was decent to fit and the tray fitted nicely one sliding door was nice touch on the screen . Cheers Kop
 
As you asked, this week we are working on a request for 300mw of Solar Roof for a Middle East Contract. At first shot its £18m plus for the basic stuff. There are 3 people on this project plus the factoring people and Uk Government Dept Then Mike and I send it on for verification. Normally
Api 2006 operates an annual plan plus month to month projections. Most of our stuff is
basic plumbing and heating devices which we concieve, design, test, produce ..market
or sell. We have been at it 20 years most weeks are more normal. centralheatking
look up versatyle or VSolar on google if you want to see more chk
 
If the guy has finished fitting the new diesel heater Incl pipe, pump and filter and connected the new lpg gas oven and seperate hob then I`m playing at being a kitchen fitter and carpet layer. 🙂
 
We need pictures chaps something to get Dan's attention and get him interested I am working on a nice project and i will post a few next week . Kop
[automerge]1572711827[/automerge]
If the guy has finished fitting the new diesel heater Incl pipe, pump and filter and connected the new lpg gas oven and seperate hob then I`m playing at being a kitchen fitter and carpet layer. 🙂
Nice one she must be taking g shape now bud ????. Kop
 
Nice one she must be taking shape now bud ????. Kop
.
She is almost there Kop, waiting on the new dashboard and gauges to turn up and the canopy guys to come and fit the new canopy, they are doing it because it`s never had a front canopy so need to fit the turnbuttons as well which I didn`t fancy doing tbh then once the galley and carpets are done that`s it for this year then need to refill the bank account before a paint job on the outside next summer.
 
That's the thing with boats mate they can be a bit of a money pit always something that needs doing sure it will be worth it in the end . Cheers kop
I have had two boats...whats the second best memory of owning a boat...when you buy it
the best memory is when you sell it....I cannot agree more..but at least they are cheaper
than your wife's horses...never owned any but know a few who have..bad news
centralheatking
 
I tile down to within one tile/cut tile. Batten, fit bath as normal then fit last row down to bath.

Just helps minimise potential of damage to bath or shower tray.
You're got it bud 123456
[automerge]1573646391[/automerge]
How do you secure the bath once tiled?
Leave the last row bud . Cheers kop
[automerge]1573646392[/automerge]
How do you secure the bath once tiled?
Leave the last row bud . Cheers kop
[automerge]1573646394[/automerge]
How do you secure the bath once tiled?
Leave the last row bud . Cheers kop
 

Attachments

Last edited:

Official Sponsors of Plumbers Talk

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Weekly or Monthly Email Digest

Back
Top