I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
Bath is in connected up boxings done combination units to do next. Kop
[automerge]1604002876[/automerge]
Bit more done today bit of a cosy fit nice units though (eco bathrooms ) all be they are sprayed MDF 😜
Put this one to bed today replaced the rad for a towel rail to give a bit more room at the loo fished all the fiddly bits off 😆 turned out pretty good considering what I had to work with. Cheers chaps kop
Ball ache you got there Simon 🤣 kop
[automerge]1604430067[/automerge]
Done and dusted this one not sorry either customer was ringing me every day 🤬 till I got it finished . Kop
Still in the beehive. Calling to drippy tap, leak in utility and leak outside.
Calling back tomorrow night with new tap, sika flow switch for oil combi and new washing machine valve.
😂😂 this one's not great if I'm honest (Topps tiles) they often break putting the wedges in but they will do supposed to regularised slate but a few high spots but will be fine once completed.kop