Hi guys, been dealing with a particularly fussy customer. weve done a mid range bathroom for her and through out the whole thing weve had to move things change things re silicon things etc, not because we have poor standards but because the customer keeps changing his mind. he told us to fit the sink and vanity unit that HE supplied, so we did, when he came home that night he wasnt happy with the seal we did as it was almost 1 mm thicker at one end of the worktop than the other end, we had to lower the mirror which he told us to put so his eyeline was at the centre of the mirror, but when he saw it he wanted it lowered. 7
its driving us mad, its not like were just throwing it in there, we allowed one week to do everything from rip out to tiling fitting plastering boarding etc, so far weve worked from 7-7 almost every day for the past 7 days and were still not quite finished because he keeps changing how he wants things. we now have 2 bathroom jobs to juggle aswell as the little inbetween jobs to get done.
some jobs are just not worth doing, wish customers could have neon signs above their front doors saying "im a cheap skate" "i cant make my mind up and ill make you re do everything twice before i decide it looked better the first way"
ahhhhh anyways
Rant over, 🙄
its driving us mad, its not like were just throwing it in there, we allowed one week to do everything from rip out to tiling fitting plastering boarding etc, so far weve worked from 7-7 almost every day for the past 7 days and were still not quite finished because he keeps changing how he wants things. we now have 2 bathroom jobs to juggle aswell as the little inbetween jobs to get done.
some jobs are just not worth doing, wish customers could have neon signs above their front doors saying "im a cheap skate" "i cant make my mind up and ill make you re do everything twice before i decide it looked better the first way"
ahhhhh anyways
Rant over, 🙄