Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Dec 28, 2012
910
7
18
Hi on some new new build houses I plan to first fix the up stairs radiators in 15mm copper coming up though the floor at the pipe centers for the radiator. i,e rad. length add 45mm per side and the correct distance from the finish wall. However I am debating how to feed the downstairs radiators, this pipe work is usual feed behind the dot and dab plaster. What do people find is the best way of doing this. Thanks for any advice.
 
No i don't like doing are these for speedfit or a different plastic pipe then? Can imagine they will do one specially for plastic?

i cant say sorry (havent used them)

but you can get rad valves in push fit tho

RAS-C2%20with%20Push-fit%20elbow_wpdp.jpg
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.