Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

What we all working on this week ?

View the thread, titled "What we all working on this week ?" which is posted in UK Plumbers Forums on UK Plumbers Forums.

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 312
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 143
Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
View attachment 44425
Ugh, I feel for you. I have been there many of times.
 
It should still be a set standard though mate. I want to know who signs this stuff off before the plasterboard goes up and is skimmed.

I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
 
I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
I see it all the time mate. My estate is a new build and there is loads of others by where I live.
 
Lights and fan done today i got the towel rail fitted shower doors installed and sealed up all ready to use. Kop
 

Attachments

  • IMG_20200703_175012.jpg
    IMG_20200703_175012.jpg
    117.1 KB · Views: 35
  • IMG_20200703_175026.jpg
    IMG_20200703_175026.jpg
    91.8 KB · Views: 37
Nothing as nice as that today KOP. Revisit a bathroom I did about 8 years ago to change the bath and basin taps.
The shower enclosure has never been used. Extremely low water pressure due to steel supply pipe, was going to be replaced a couple of months after I did the shower. They still haven't got round to doing it.

20200703_105556.jpg20200703_105549.jpg20200703_105532.jpg
 
All in one worktop Mate?
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
 
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
Looks good though mate.

I did these on a Friday
 

Attachments

  • 28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    143.3 KB · Views: 38
  • 659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    151.2 KB · Views: 37
  • C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    125.9 KB · Views: 36
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop

I'm finding I'm always changing the guts on toilets before installing when customer supplies. Not worth the hassle of some of the tat you see when you open them up.
It's got to the point now where I just add money on when I do the estimate.
 
Last edited:
Nice job H good to see you back .
Nice H good to see you back bet they will be put to good use next week 😂😂
[automerge]1593962219[/automerge]

Spot on mate turn up on time and no breakages 😄

Thanks mate. Doing more now. But will not be doing as many hours as before lock down. I’m enjoying family time to much if I’m honest.
 
Update chaps job is done and dusted and in use moved on to two kitchen first fixes , and a couple of designer type rads, another shower room to start next week . Regards Kop
 

Attachments

  • IMG_20200707_143928.jpg
    IMG_20200707_143928.jpg
    99.9 KB · Views: 33
  • MVIMG_20200707_143920.jpg
    MVIMG_20200707_143920.jpg
    117.2 KB · Views: 31
  • MVIMG_20200707_143955.jpg
    MVIMG_20200707_143955.jpg
    108.5 KB · Views: 27
Potentially my next job. Oil boiler and unvented cylinder, tie up the underfloor heating, complete first fix for upstairs heating and first fix hot and cold to 3 bathrooms, cloakroom, utility and kitchen.
Then back to complete the bathrooms.

20200708_165426.jpg20200708_165433.jpg20200708_165445.jpg20200708_165455.jpg20200708_165501.jpg20200708_165507.jpg20200708_165523.jpg20200708_165843.jpg20200708_165946.jpg20200708_165951.jpg
 
Customer has done everything upto now.

Nothings been pressure tested, underfloor heating wasnt filled or pressurised at screed going down.

Architect has screwed up left right and centre

Got it all covered in t & c's, labour and consumables only. Invoiced and paid on a friday when I've been there. Just waiting for written confirmation to go ahead.
 
Need to replace this water heater for a customer he wants a small combi fitted but only use the hot water side for now with rads fitted at a later date , it needs to be rear flued as below and the flue route is challenging , your opinions chaps ??? Valliant pure is looking like it may work ??
 

Attachments

  • IMG_20200710_163628.jpg
    IMG_20200710_163628.jpg
    81.4 KB · Views: 48
  • IMG_20200710_163648.jpg
    IMG_20200710_163648.jpg
    178.4 KB · Views: 49
  • IMG_20200710_163640.jpg
    IMG_20200710_163640.jpg
    126.8 KB · Views: 42
Well looks like I wont be doing the chapel after all, bloke thinks my price for first fix and boiler/cylinder is too expensive. Put in 13 days all on copper. 4 1/2 days for boiler and cylinder room inc controls wiring. 4 days to first fix the three bathrooms. 1 day for kitchen and cloakroom. 1 day to fill and pressure test. 1/2 day for oil line (not an easy run). 1 day to flush refill and commission boiler and a days feck factor.
Never mind.
 

Official Sponsors of Plumbers Talk

Reply to the thread, titled "What we all working on this week ?" which is posted in UK Plumbers Forums on Plumbers Forums.

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Thread statistics

Created
king of pipes,
Last reply from
Chuck,
Replies
2,169
Views
149,238
Back
Top