- May 23, 2015
- 35,144
- 1
- 14,996
- 113
- Member Type
- Heating Engineer (Has GSR)
Tbh would let the electrics go as you’ve got sparkles rewiring
But condense needs to be 11/4 min through the wall and insulated not overflow
But condense needs to be 11/4 min through the wall and insulated not overflow